Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide upgrade facility generator controls construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct the MOC generator upgrade.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Construct the MOC generator upgrade.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Building 16 Generator PLC Upgrade. Work shall consist of but is not limited to the following: Inspect, troubleshoot, and repair or replace generator PLC controls. PLC is a Telmecanique/Advantys STBNMP2212 PLC Island and connected output modules controlling a Kohler 1.5 MW Diesel Generator set. Contractor is to troubleshoot and repair PLC to original installation parameters. Verify restored PLC/Generator set operations and communication. Ensure repairs with a function check of generator operations in standalone and parallel modes. There will be an option to install a Hot Switch Bypass.
Posted Date
Jan 10, 2026
Due Date
Jan 28, 2026
Release: Jan 10, 2026
Close: Jan 28, 2026
Building 16 Generator PLC Upgrade. Work shall consist of but is not limited to the following: Inspect, troubleshoot, and repair or replace generator PLC controls. PLC is a Telmecanique/Advantys STBNMP2212 PLC Island and connected output modules controlling a Kohler 1.5 MW Diesel Generator set. Contractor is to troubleshoot and repair PLC to original installation parameters. Verify restored PLC/Generator set operations and communication. Ensure repairs with a function check of generator operations in standalone and parallel modes. There will be an option to install a Hot Switch Bypass.
AvailableReplace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Feb 27, 2026
Release: Oct 28, 2025
Close: Feb 27, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableCity of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
City of Hinesville seeks Construction Management at Risk Services for the expansion and upgrade of its Water Reclamation Facility from 2.0 MGD to 4.0 MGD, including force main installation and various WRF component upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →