Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Pennsylvania State University (OPP) is soliciting bids for the rehabilitation of the HUB Parking deck at the University Park campus, addressing maintenance and repair items. Bids are received electronically via the Trimble Unity Construct Bid Portal; the project currently lists a Masonry Construction package. The solicitation is active and shown as Out to Bid on the OPP site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Design-Build services for the rehabilitation of the 33 Pryor Street Parking Deck.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
Procurement of Design-Build services for the rehabilitation of the 33 Pryor Street Parking Deck.
AvailableDesign-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Design-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
Posted Date
Oct 3, 2025
Due Date
Feb 6, 2026
Release: Oct 3, 2025
Close: Feb 6, 2026
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
AvailableWork includes 1 LS clearing and grubbing; 1,742 CY excavation; 62.50 LF guardrail, type mgs; 12 EA mgs bridge terminal assembly, type 1; 171 LF fence, type 47; 114 LF concrete barrier, single slope, type c-50; 169 CY topsoil; 505 SY seeding and mulching; 1,005 SY slope erosion protection; 15 LF 4" unclassified pipe underdrains; 18 LF 12" conduit, type b; 9 EA precast reinforced concrete outlet; 641 CY asphalt concrete base; 97 CY aggregate base; 585 GAL non-tracking tack coat; 70.30 SF sign, flat sheet; 25 LF stop line, type 1; 750 SF patching concrete structure.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Work includes 1 LS clearing and grubbing; 1,742 CY excavation; 62.50 LF guardrail, type mgs; 12 EA mgs bridge terminal assembly, type 1; 171 LF fence, type 47; 114 LF concrete barrier, single slope, type c-50; 169 CY topsoil; 505 SY seeding and mulching; 1,005 SY slope erosion protection; 15 LF 4" unclassified pipe underdrains; 18 LF 12" conduit, type b; 9 EA precast reinforced concrete outlet; 641 CY asphalt concrete base; 97 CY aggregate base; 585 GAL non-tracking tack coat; 70.30 SF sign, flat sheet; 25 LF stop line, type 1; 750 SF patching concrete structure.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.