Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Available(1.6-Mi.) Project consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement, median removal and replacement and curb and gutter replacement, thermoplastic pavement marking. See outside link.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
(1.6-Mi.) Project consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement, median removal and replacement and curb and gutter replacement, thermoplastic pavement marking. See outside link.
AvailableWork includes 997 SY bridge deck scarification 3/4"; 997 SY bridge deck latex concrete overlay, 2 1/2"; 14 SY approach slab repair (partial depth); 914 SY bridge deck grooving (longitudinal); 32 EA. Barrier wall reflectors, type c; 3,163 SF thermoplastic pavement marking - line 4"; 35 sf thermoplastic pavement marking - line 12"; 102 SF preformed joint strip seal; 54 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 306 SY hot-mix asphalt surface removal - butt joint.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 997 SY bridge deck scarification 3/4"; 997 SY bridge deck latex concrete overlay, 2 1/2"; 14 SY approach slab repair (partial depth); 914 SY bridge deck grooving (longitudinal); 32 EA. Barrier wall reflectors, type c; 3,163 SF thermoplastic pavement marking - line 4"; 35 sf thermoplastic pavement marking - line 12"; 102 SF preformed joint strip seal; 54 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 306 SY hot-mix asphalt surface removal - butt joint.
AvailableWork includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis