Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of Design-Build services for the rehabilitation of the 33 Pryor Street Parking Deck.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Invest Atlanta (the Atlanta Development Authority) is soliciting competitive sealed responses to select a single firm to provide design-build services to rehabilitate the nine-level parking structure at 33 Pryor Street SE in Atlanta, GA. Work includes demolition and rebuilding of upper levels into parking, maintaining street-level retail, replacing major MEP systems and elevators, and possible addition of EV chargers. The project phases span schematic design in 2026 through construction with completion anticipated in September 2027.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Premium
Access the largest public sector contact database
Invest Atlanta (the Atlanta Development Authority) is soliciting competitive sealed responses to select a single firm to provide design-build services to rehabilitate the nine-level parking structure at 33 Pryor Street SE in Atlanta, GA. Work includes demolition and rebuilding of upper levels into parking, maintaining street-level retail, replacing major MEP systems and elevators, and possible addition of EV chargers. The project phases span schematic design in 2026 through construction with completion anticipated in September 2027.
Design-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Design-Build: Rehabilitating Parking deck. Demolition of existing levels 8 and 9 is currently built as offices and rebuilding them into parking levels. Maintain 10,000 SF of retail space on street level (level 3) and convert the rest into parking spaces. Partial demolition of one bay of level 4 office space to allow for double height retail on level 3 below. Full replacement of major systems including but not limited to mechanical, electrical, plumbing, elevators, sprinklers, etc., as well as addition of EV chargers (if necessary). Interior renovation of the retail space. Minor repair, fresh paint, and hardware replacement throughout the parking deck. As-built plans may be required to complete the design for this rehabilitation project.
AvailableSupply of 9 separate proposals for playground equipment and shade structures.
Posted Date
Oct 24, 2025
Due Date
Dec 18, 2025
Release: Oct 24, 2025
Close: Dec 18, 2025
Supply of 9 separate proposals for playground equipment and shade structures.
AvailableRFP for consulting services in the development of a community wayfinding program.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
RFP for consulting services in the development of a community wayfinding program.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis