Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for underground components. Provide connector service connector, "red" 1 solid to "red" 1 solid and 1&2 strandedmfg: (1) homac #urr 22 (2) burndy #es2r2r vendors: homac; anixter 331 ea, connector, single bolt, #2- 4/0 acsrmfg: (1) fargo #ga- 9040gl -- std pkg 50 vendors: anixter; wesco; one source 55 ea, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide boots, rain, dielectric,rubber, size 7, overshoe, minimum of 14" tall to a maximum of 18" tall, brown or yellow in color,must be "dielectric" per american society for testing and materials (astm) must meet specification #f1117 for dielectric footwear. Mfg: salisbury #5eu29. See attached file.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Provide boots, rain, dielectric,rubber, size 7, overshoe, minimum of 14" tall to a maximum of 18" tall, brown or yellow in color,must be "dielectric" per american society for testing and materials (astm) must meet specification #f1117 for dielectric footwear. Mfg: salisbury #5eu29. See attached file.
AvailableThis RFP is for the procurement of Network Switch and Related Components, an equipment-only request, with no configuration, staging, or asset tagging services required.
Posted Date
-
Due Date
Apr 1, 2026
Close: Apr 1, 2026
This RFP is for the procurement of Network Switch and Related Components, an equipment-only request, with no configuration, staging, or asset tagging services required.
AvailableThe selected firms shall provide engineering design services to prepare schematic design and bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding for the required storm drain rehabilitation/improvement project.
Posted Date
Jan 6, 2026
Due Date
Mar 16, 2026
Release: Jan 6, 2026
Close: Mar 16, 2026
The selected firms shall provide engineering design services to prepare schematic design and bid documents (plans, specifications, and engineer’s estimate - PS&E) for public works bidding for the required storm drain rehabilitation/improvement project.
AvailableCab & chassis for master agreement.
Posted Date
Jan 20, 2026
Due Date
Feb 3, 2026
Release: Jan 20, 2026
Close: Feb 3, 2026
Cab & chassis for master agreement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis