Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Maryland—College Park issued IFB 00031388 to replace fan coil unit (FCU) controllers at Oakland Hall, requiring removal of existing controllers and installation of BACnet/IP Distech ECY-Series controllers. The project includes wiring, testing, commissioning, and finishing work with an estimated value between $50,000 and $150,000. Bidders must attend a pre-bid conference at Oakland Hall and submit required affidavits and insurance documentation by the February 2026 deadline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes replace chilled water coils, supply fan motors and return fan motors and will convert existing pneumatic to ddc controls. The motors, drives and controls are accessible from the mechanical room next to the air handling unit. The chilled water coils on the ground floor are accessible through the same mechanical room. The chilled water coils on floors 1 through 3 are accessible through the outside air louvers.
Posted Date
Jan 19, 2026
Due Date
Feb 24, 2026
Release: Jan 19, 2026
Close: Feb 24, 2026
Work includes replace chilled water coils, supply fan motors and return fan motors and will convert existing pneumatic to ddc controls. The motors, drives and controls are accessible from the mechanical room next to the air handling unit. The chilled water coils on the ground floor are accessible through the same mechanical room. The chilled water coils on floors 1 through 3 are accessible through the outside air louvers.
AvailableThe University of Nevada, Reno issued ITB 9075 for replacement of kitchen flooring at Canada Hall involving removal of existing VCT and tile and replacement with LVT and new tile, including patching and painting of walls. This is a prevailing wage construction solicitation with an estimated cost range of $331,000–$431,000 and liquidated damages of $200/day per affected resident bed for work extending beyond permitted dates. Submission is electronic via the buyer’s procurement portal; a mandatory pre-bid job walk is required and questions must be submitted by the posted questions cut-off.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The University of Nevada, Reno issued ITB 9075 for replacement of kitchen flooring at Canada Hall involving removal of existing VCT and tile and replacement with LVT and new tile, including patching and painting of walls. This is a prevailing wage construction solicitation with an estimated cost range of $331,000–$431,000 and liquidated damages of $200/day per affected resident bed for work extending beyond permitted dates. Submission is electronic via the buyer’s procurement portal; a mandatory pre-bid job walk is required and questions must be submitted by the posted questions cut-off.
Release: Jan 7, 2026
Close: Jan 26, 2026
Provide streetlight controller upgrades.
Provide Controller - Coolant ; Compressor - A/c.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Provide Controller - Coolant ; Compressor - A/c.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis