Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
University Of Nevada Reno
This Invitation for Bid (ITB 9099) issued by BCN Purchasing on behalf of the University of Nevada, Reno requests replacement of two existing 1.5 MBH boilers at the Lake Tahoe Prim Library with work classified as a prevailing wage project. The estimated cost range is $50,000 to $150,000, with liquidated damages of $200 per day and standard contractor insurance requirements; submission is electronic via the buyer's procurement system. The solicitation was posted 2026-04-23 and responses are due 2026-05-14.
Posted Date
Apr 23, 2026
Due Date
May 14, 2026
Release: Apr 23, 2026
University Of Nevada Reno
Close: May 14, 2026
This Invitation for Bid (ITB 9099) issued by BCN Purchasing on behalf of the University of Nevada, Reno requests replacement of two existing 1.5 MBH boilers at the Lake Tahoe Prim Library with work classified as a prevailing wage project. The estimated cost range is $50,000 to $150,000, with liquidated damages of $200 per day and standard contractor insurance requirements; submission is electronic via the buyer's procurement system. The solicitation was posted 2026-04-23 and responses are due 2026-05-14.
AvailableUniversity Of Nevada Reno
This Invitation for Bid (ITB 9100) requests contractors to replace the hot-water boiler in Juniper Hall Room M001 at the University of Nevada, Reno, likely installing two smaller boilers and complying with prevailing wage requirements. BCN Purchasing is issuing the solicitation on behalf of UNR; required insurances and liquidated damages ($500/day) are specified, and a mandatory pre-bid job walk is scheduled. Bids must be submitted electronically via the Nevada eMarketplace (NGEM) by the posted due date; several attachments including drawings and contract templates are available on the opportunity page.
Posted Date
Apr 23, 2026
Due Date
May 21, 2026
Release: Apr 23, 2026
University Of Nevada Reno
Close: May 21, 2026
This Invitation for Bid (ITB 9100) requests contractors to replace the hot-water boiler in Juniper Hall Room M001 at the University of Nevada, Reno, likely installing two smaller boilers and complying with prevailing wage requirements. BCN Purchasing is issuing the solicitation on behalf of UNR; required insurances and liquidated damages ($500/day) are specified, and a mandatory pre-bid job walk is scheduled. Bids must be submitted electronically via the Nevada eMarketplace (NGEM) by the posted due date; several attachments including drawings and contract templates are available on the opportunity page.
AvailableUniversity Of Nevada Reno
Work includes installation of a grow conex, provided by owner (unr), which encompasses site preparation, foundation work, and utility connections, as outlined in the construction plans prepared by tsk architects. The project will require inspections by the spwd and additional special inspections. The general contractor will be responsible for coordinating these required inspections in accordance with the construction documents. The grow conex will be supplied by gp solutions, and the general contractor is also responsible for coordinating with gp solutions regarding the installation and delivery schedule as well as disposal of all waste associated with the purchased materials (e. G. Pallets, boxes, packing material, etc. ).
Posted Date
Apr 16, 2026
Due Date
May 7, 2026
Release: Apr 16, 2026
University Of Nevada Reno
Close: May 7, 2026
Work includes installation of a grow conex, provided by owner (unr), which encompasses site preparation, foundation work, and utility connections, as outlined in the construction plans prepared by tsk architects. The project will require inspections by the spwd and additional special inspections. The general contractor will be responsible for coordinating these required inspections in accordance with the construction documents. The grow conex will be supplied by gp solutions, and the general contractor is also responsible for coordinating with gp solutions regarding the installation and delivery schedule as well as disposal of all waste associated with the purchased materials (e. G. Pallets, boxes, packing material, etc. ).
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If proprietary or compatibility-critical, draft the justification with the department and submit to BCN for exception approval.
Coops: If your product is on a cooperative, ask BCN Purchasing to confirm access and buy off the pre-competed agreement to bypass formal bids (especially >$50,000).
Position your product as proprietary or uniquely aligned to research, academic, or grant-funded needs to meet UNR’s competitive exception criteria. Work with the end‑user department to draft a justification emphasizing vendor exclusivity, research continuity, or critical compatibility with existing equipment.
Track vendor wins and renewal opportunities
University Of Nevada Reno
This document details two separate service agreements between Watermark Insights, LLC and the University of Nevada, Reno. The initial agreement, referencing Quote #Q-18799-1, provides a Campus Wide Web-based Platform for Planning and Self-Study, Outcome Assessment Projects, and academy credits from January 1, 2023, to December 31, 2025, with specific annual costs for each of its three terms. A subsequent agreement, referencing Quote #Q-35124, covers an advanced Planning and Self-Study platform, Assessment Projects, and a Silver Service Package for a five-year period from January 1, 2026, to December 31, 2030, with an explicit total contract value of $658,303.23 over its five terms. Both agreements are governed by provided terms and conditions.
Effective Date
Jan 1, 2023
Expires
Effective: Jan 1, 2023
University Of Nevada Reno
Expires:
This document details two separate service agreements between Watermark Insights, LLC and the University of Nevada, Reno. The initial agreement, referencing Quote #Q-18799-1, provides a Campus Wide Web-based Platform for Planning and Self-Study, Outcome Assessment Projects, and academy credits from January 1, 2023, to December 31, 2025, with specific annual costs for each of its three terms. A subsequent agreement, referencing Quote #Q-35124, covers an advanced Planning and Self-Study platform, Assessment Projects, and a Silver Service Package for a five-year period from January 1, 2026, to December 31, 2030, with an explicit total contract value of $658,303.23 over its five terms. Both agreements are governed by provided terms and conditions.
AvailableUniversity Of Nevada Reno
This comprehensive document outlines a Master Services Agreement between Anthology Inc. and the University of Nevada, Reno, effective June 15, 2021. It details various services, subscriptions, and professional services through a series of Purchase Orders, Work Orders, Invoices, and Renewal Notices. Services include a "Blueprint Microsite Package", annual "Encompass" subscriptions and giving platforms, "Engage" and "Baseline" platforms (known as "Pack Life"), and professional service retainers. The agreements span from February 2023 to June 2026, with individual transaction amounts ranging from $4,850.00 to $96,938.00.
Effective Date
Feb 1, 2023
Expires
Effective: Feb 1, 2023
University Of Nevada Reno
Expires:
This comprehensive document outlines a Master Services Agreement between Anthology Inc. and the University of Nevada, Reno, effective June 15, 2021. It details various services, subscriptions, and professional services through a series of Purchase Orders, Work Orders, Invoices, and Renewal Notices. Services include a "Blueprint Microsite Package", annual "Encompass" subscriptions and giving platforms, "Engage" and "Baseline" platforms (known as "Pack Life"), and professional service retainers. The agreements span from February 2023 to June 2026, with individual transaction amounts ranging from $4,850.00 to $96,938.00.
AvailableUniversity Of Nevada Reno
This document outlines multiple agreements between EAB Global, Inc. and the University of Nevada, Reno, for various educational technology and student success services. Key programs include Navigate, Academic Affairs Forum, Milestone Guidance, Enroll360/Appily, Edify, and Rapid Insight. The agreements span different terms, with the earliest starting June 30, 2020, and the latest extending to June 29, 2030. Fees are structured annually per program, with several new multi-year Program Order Forms commencing in 2024 and 2025, some of which provide fees for initial years but not the full term. The Master Agreement and Technology Program Supplement provide the overarching terms and conditions.
Effective Date
Jun 30, 2020
Expires
Effective: Jun 30, 2020
University Of Nevada Reno
Expires:
This document outlines multiple agreements between EAB Global, Inc. and the University of Nevada, Reno, for various educational technology and student success services. Key programs include Navigate, Academic Affairs Forum, Milestone Guidance, Enroll360/Appily, Edify, and Rapid Insight. The agreements span different terms, with the earliest starting June 30, 2020, and the latest extending to June 29, 2030. Fees are structured annually per program, with several new multi-year Program Order Forms commencing in 2024 and 2025, some of which provide fees for initial years but not the full term. The Master Agreement and Technology Program Supplement provide the overarching terms and conditions.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track University Of Nevada Reno's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database