Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
RPO EAST (36C24E)
Chiller capacity and controls upgrade.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New Hope Christian School
The replacement of the existing air-cooled chiller and upgrading the controls system. The recommended basis of design is a Trane Ascend ACS215 (approx. 215-ton) air-cooled scroll chiller, replacing the existing 270-ton RTAA unit. The existing machine has a history of low-load trips (low suction pressure); per operating history, one circuit was down (β60% capacity) for the 2025 cooling season with no loss of comfort.
Posted Date
Oct 24, 2025
Due Date
Dec 3, 2025
Release: Oct 24, 2025
New Hope Christian School
Close: Dec 3, 2025
The replacement of the existing air-cooled chiller and upgrading the controls system. The recommended basis of design is a Trane Ascend ACS215 (approx. 215-ton) air-cooled scroll chiller, replacing the existing 270-ton RTAA unit. The existing machine has a history of low-load trips (low suction pressure); per operating history, one circuit was down (β60% capacity) for the 2025 cooling season with no loss of comfort.
Available631-Leeds (00631)
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
Posted Date
Oct 28, 2025
Due Date
Jan 21, 2026
Release: Oct 28, 2025
631-Leeds (00631)
Close: Jan 21, 2026
Replace boilers & upgrade controls. For this requirement, the general contractor will be required to include general construction, demolition, modification, and renovation of the existing central boiler plant (building 8)
AvailableKentucky Transportation Cabinet
Security controls repair/upgrade.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
Kentucky Transportation Cabinet
Close: Nov 20, 2025
Security controls repair/upgrade.
AvailableCity of New York
Upgrading and optimizing building control systems from pneumatic or manual controls to digital controls in an efficient and scalable manner.
Posted Date
Oct 29, 2025
Due Date
Jan 16, 2026
Release: Oct 29, 2025
City of New York
Close: Jan 16, 2026
Upgrading and optimizing building control systems from pneumatic or manual controls to digital controls in an efficient and scalable manner.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis