Higher EducationCT
Posted
Nov 4, 2026
Nov 23, 2026
UConn Gampel Pavilion Reno - EXPOXY RFQ Phase 2
Epoxy work for Phase 2 of the UConn Gampel Pavilion renovation.
Description: The project scope will include selective demolition (interior and exterior), structural demolition, shoring, scaffolding, concrete foundations, slab on grade, slab trenching, concrete pits and bases, structural steel, miscellaneous metals, GWB and CMU partitions, curtainwall assemblies, equipment screens, D/F/H, interior windows, ACT, interior specialties, tile, vinyl wall covering, paint, epoxy flooring, vinyl floor tile, resinous flooring, terrazzo flooring, resilient base, acoustical ceiling finishes, elevators, stairs, M/E/P-FP systems, telecommunications, sound and AV systems, access control and surveillance systems, integrated automation, interior architectural woodwork and casework. See attached files.
HigherEducation · CT, US
Adjacent opportunities open for bidding right now.
Higher EducationCT
Posted
Nov 4, 2026
Nov 23, 2026
Epoxy work for Phase 2 of the UConn Gampel Pavilion renovation.
Central Contra Costa Sanitary District
Special DistrictCA
Posted
-
Nov 12, 2026
Installing a full-scale demonstration of the Densified Activated Sludge (DAS) process, including a hydrocyclone-based physical selection system, compressed air channel mixing system, RAS piping modifications, temporary bypass pumping and piping, and power infrastructure.
CityAZ
Posted
May 6, 2026
Nov 19, 2026
Provide construction manager at risk services for stadium complex renovation project.
CityNJ
Posted
Sep 25, 2026
Nov 19, 2026
Provide auto and truck towing services.
Decision makers connected to this RFP from University Of Connecticut Stamford.
Solicitation files and supporting documents for this bid.