CityNC
Posted
-
Nov 10, 2026
Canton Water Treatment Plant Renovation – Phase 3 RFP
Improvements to the raw water intake, including work to the existing intake, replacement of raw water pumps and associated piping and controls.
Description: Phase 3 is comprised of installing new variable frequency drives (VFD’s) on the existing primary chilled water pumps and condenser water pumps. The VFD’s shall be provided by the electrical contractor, including reworking the 480V power feeds. The final termination of controls wiring at the VFD and PLC’s is by the controls contractor.
HigherEducation · AL, US
Adjacent opportunities open for bidding right now.
CityNC
Posted
-
Nov 10, 2026
Improvements to the raw water intake, including work to the existing intake, replacement of raw water pumps and associated piping and controls.
New York State University Construction Fund
State AgencyNY
Posted
Oct 14, 2026
Nov 10, 2026
Renovate plant science building - phase 2.
CityVA
Posted
-
Nov 10, 2026
Scope of work: contract 1 includes materials only, for return sludge pump impeller replacement. Contract 2 includes labor materials and equipment for installation of two sludge flow meters. Contract 3 includes labor materials and equipment for influent pump station new control programmable logic controller. Contract 4 includes labor materials and equipment to rebuild one existing centrifugal blower. Contract 5 includes labor materials and equipment for rehabilitation of two secondary clarifier concrete effluent troughs. Contract 6 includes labor materials and equipment for painting the ferrous steel of two secondary clarifiers.
CityOK
Posted
Oct 21, 2026
Nov 19, 2026
Rehabilitation of existing water treatment plant & tank rehabilitation. Water Treatment Plant - two concrete-lined backwash holding basins with supernatant decanters, decant return lift station, valve vault and piping, paving, fencing and grading; removal of the water-treatment residuals from the existing backwash holding basins; rehabilitation of the two existing steel package filter tanks (new underdrains, media and troughs, recoating of the interior steel); replacement in kind of the existing gas-chlorinator units, chlorine dioxide booster pumps, sand recirculation pumps and backwash inlet-structure slide gates; and the electrical, instrumentation and SCADA. Existing 200,000-gallon elevated water storage tank - blast and recoat of the interior and exterior, an overflow extension with flap valve and splash pad, and disinfection.
Decision makers connected to this RFP from University Of Alabama At Birmingham.
Solicitation files and supporting documents for this bid.