Open RFP

Atoka Water Treatment Plant Phase 1 Improvements RFP

Description: Rehabilitation of existing water treatment plant & tank rehabilitation. Water Treatment Plant - two concrete-lined backwash holding basins with supernatant decanters, decant return lift station, valve vault and piping, paving, fencing and grading; removal of the water-treatment residuals from the existing backwash holding basins; rehabilitation of the two existing steel package filter tanks (new underdrains, media and troughs, recoating of the interior steel); replacement in kind of the existing gas-chlorinator units, chlorine dioxide booster pumps, sand recirculation pumps and backwash inlet-structure slide gates; and the electrical, instrumentation and SCADA. Existing 200,000-gallon elevated water storage tank - blast and recoat of the interior and exterior, an overflow extension with flap valve and splash pad, and disinfection.

Buyer
City of Atoka

City · OK, US

Released
Oct 21, 2026
Closes
Nov 19, 2026(25 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts