Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide turnkey services for electric vehicle supply equipment (evse), include design, purchasing, construction, installation of hardware (and accompanying evse management software), operations, maintenance, and reporting. Sites must be new direct current fast charging (dcfc) electric vehicle (ev) charging stations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Electric vehicle charging stations. Contract period: 12/01/26 - 11/30/29.
Posted Date
Jan 21, 2026
Due Date
Jun 29, 2026
Release: Jan 21, 2026
Close: Jun 29, 2026
Electric vehicle charging stations. Contract period: 12/01/26 - 11/30/29.
AvailableInstallation of two (2) Level 3 Electric Vehicle (DCFC) charging stations and related buried electrical lines and equipment.
Posted Date
Jan 13, 2026
Due Date
Feb 3, 2026
Release: Jan 13, 2026
Close: Feb 3, 2026
Installation of two (2) Level 3 Electric Vehicle (DCFC) charging stations and related buried electrical lines and equipment.
AvailableProvide electric charging stations to accommodate 3 electric buses as noted below. Installation of a new medium voltage switch, 750kva primary transformer, nema 3r 800-amp 480v service, conduit & wiring, (2) dual charging stations with operation software.
Posted Date
Dec 29, 2025
Due Date
Feb 6, 2026
Release: Dec 29, 2025
Close: Feb 6, 2026
Provide electric charging stations to accommodate 3 electric buses as noted below. Installation of a new medium voltage switch, 750kva primary transformer, nema 3r 800-amp 480v service, conduit & wiring, (2) dual charging stations with operation software.
AvailableProvide services to conduct an electric vehicle (ev) charging infrastructure study that includes a thorough assessment of the existing charging landscape and the identification of strategic locations for new charging stations.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Provide services to conduct an electric vehicle (ev) charging infrastructure study that includes a thorough assessment of the existing charging landscape and the identification of strategic locations for new charging stations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis