Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of electric charging stations to accommodate 3 electric buses, including the installation of a 400 Amp service and two dual charging stations with operating software.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for furnishing long lead material, including the transformer and switchgear, required for the Metro Transit IL Bus Garage EV Charging Stations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
This RFP is for furnishing long lead material, including the transformer and switchgear, required for the Metro Transit IL Bus Garage EV Charging Stations.
AvailableThis contract seeks the removal and disposal of existing asphalt concrete, trenching, and installation of electric vehicle (EV) charging stations and their foundations. The project also includes PCC and hot mix placement, electrical conduit and transformer work, testing, commissioning, and site restoration. The engineer's estimate for this project is approximately $150,000, with the Otay Water District as the requesting agency.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
This contract seeks the removal and disposal of existing asphalt concrete, trenching, and installation of electric vehicle (EV) charging stations and their foundations. The project also includes PCC and hot mix placement, electrical conduit and transformer work, testing, commissioning, and site restoration. The engineer's estimate for this project is approximately $150,000, with the Otay Water District as the requesting agency.
AvailableSeeking proposals for the procurement of Electric Bus Charging Stations.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Seeking proposals for the procurement of Electric Bus Charging Stations.
AvailableFor consideration and support for the planning, deployment, operation, maintenance, and management of Electric Vehicle (EV) Charging Stations along seven (7) US Routes. Required to implement a reliable program which will enable the public to utilize direct current fast charging (DCFC) stations on a 24-hour/365 days per year basis, with sufficient resources and personnel to successfully support, maintain and sustain the NEVI Formula Program. Proposed sites must have at least four (4) 150 kilowatts (kW) DCFC stations with combined charging systems (CCS) ports, capable of simultaneously DC charging for four (4) EVs.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
For consideration and support for the planning, deployment, operation, maintenance, and management of Electric Vehicle (EV) Charging Stations along seven (7) US Routes. Required to implement a reliable program which will enable the public to utilize direct current fast charging (DCFC) stations on a 24-hour/365 days per year basis, with sufficient resources and personnel to successfully support, maintain and sustain the NEVI Formula Program. Proposed sites must have at least four (4) 150 kilowatts (kW) DCFC stations with combined charging systems (CCS) ports, capable of simultaneously DC charging for four (4) EVs.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis