Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Generally, the work includes, but is not limited to: removing the existing cast iron tub in twenty (20) apartments and installing a new acrylic tub to shower conversion kit complete with new shower valve, head and trim kit. Accessories to be included in the installation are grab bars, soap dish caddy, shower curtain rod & curtain. Other incidental work required to complete the shower installation is also included.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Updated plumbing for two residential apartment complexes: 60 units.
Posted Date
Dec 18, 2025
Due Date
Jan 19, 2026
Release: Dec 18, 2025
Close: Jan 19, 2026
Updated plumbing for two residential apartment complexes: 60 units.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
Posted Date
Dec 17, 2025
Due Date
Feb 12, 2026
Release: Dec 17, 2025
Close: Feb 12, 2026
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
AvailableSeeking a contractor for turnkey renovations. The Contractor's work includes all labor, equipment and tools required to perform the work in the apartment. Please fill out each bid line item in documents pertaining dollar amounts. Also, please see Construction Safety Policy Manual attachment as well for our safety procedures.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Seeking a contractor for turnkey renovations. The Contractor's work includes all labor, equipment and tools required to perform the work in the apartment. Please fill out each bid line item in documents pertaining dollar amounts. Also, please see Construction Safety Policy Manual attachment as well for our safety procedures.
AvailableProvide consultant services for the sycamore trail phase iv and v feasibility study.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Provide consultant services for the sycamore trail phase iv and v feasibility study.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →