Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project includes removal of existing flooring at community building foyer, restrooms, office, kitchen and laundry area; removal of existing flooring at residential building front hallways (1st & 2nd floors) as well as removal of vinyl treads at stairwells. Replace with lvt at all floors and landings, and replace vinyl treads with same.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
This project includes removal of existing flooring at community building foyer, restrooms, office, kitchen and laundry area; removal of existing flooring at residential building front hallways (1st & 2nd floors) as well as removal of vinyl treads at stairwells. Replace with lvt at all floors and landings, and replace vinyl treads with same.
AvailableThis project includes removal of existing flooring at community building foyer, restrooms, office, kitchen and laundry area; removal of existing flooring at residential building front hallways (1st & 2nd floors) as well as removal of vinyl treads at stairwells. Replace with lvt at all floors and landings, and replace vinyl treads with same.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
This project includes removal of existing flooring at community building foyer, restrooms, office, kitchen and laundry area; removal of existing flooring at residential building front hallways (1st & 2nd floors) as well as removal of vinyl treads at stairwells. Replace with lvt at all floors and landings, and replace vinyl treads with same.
AvailableWork includes replacement of stoops. See outside link.
Posted Date
Oct 29, 2025
Due Date
Jan 28, 2026
Release: Oct 29, 2025
Close: Jan 28, 2026
Work includes replacement of stoops. See outside link.
AvailableWork includes campground #4 shower house replacement.
Posted Date
Dec 16, 2025
Due Date
Feb 3, 2026
Release: Dec 16, 2025
Work includes campground #4 shower house replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis