Open RFP

TSS 135 Elmhurst 34kV Switchgear Building Extension (Request for Proposal))

Description: Substation Civil Work: Install building drilled piers/foundation with required steel structure embeds for steel structures and precast panels; Provide required sump pits, if noted; Provide all conduit within the building foundation; Provide all conduit for the project as shown; Provide alternate pricing to install non-concrete encased conduit; Provide alternate pricing to install grounding; Exterior Aux Power pads and conduit work, if noted; All conduit exiting the building foundation will be stubbed and marked 5 feet from the building for future connection of the distribution duct packages; Include option pricing for monthly concrete blankets and heater rentals to support winter conditions for the duration of construction.Switchgear Building: Install building, including but not limited to pre-cast concrete, and steel structures. Pre-cast panels and steel structure are ordered, designed and in manufacturing at time of this RFP. See outside link.

Buyer
Released
May 6, 2026
Closes
Sep 18, 2026(15 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts