CityPA
Posted
Aug 21, 2026
Sep 28, 2026
MLK Trail Phase 1 Construction
Construct a shared use path.
Description: Construction of approx 8,000 LF of asphalt multi-use path work also includes approx 1,650 LF of new asphalt and concrete pedestrian paths, scrub seal, restriping, and shared-use bike lane designations in downtown courtland, improvements, signing, and ada-compliant curb ramps and detectable warning surfaces.
SpecialDistrict · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityPA
Posted
Aug 21, 2026
Sep 28, 2026
Construct a shared use path.
CityMO
Posted
Sep 2, 2026
Oct 1, 2026
The City of Neosho is soliciting bids for Phase 4 of the Morse Park Trail Lighting project, extending lighting from E. Spring Street to the Lampo Building. The project is part of a multi-year effort to replace existing solar lighting with a more cost-efficient and reliable electrical system. The solicitation is open, was published on September 2, 2026, and closes October 1, 2026, at 2:00 PM local time.
CityKY
Posted
Sep 2, 2026
Sep 24, 2026
The project will consist of asphalt pavement trail installation, construction of three wooden boardwalks of varying lengths, construction of a 210 foot bridge with a lookout crossing a pond, construction of swales and storm systems, excavation, and reseeding.
CityAR
Posted
Sep 13, 2026
Sep 28, 2026
Construction of approximately 2,130 linear feet of concrete bike/pedestrian trail and tie-ins to existing driveway and sidewalk.