Summary
Construction contractor shall provide all labor, material and equipment to construct a new, fully designed tritium administration building. The tritium administration building specifications summarize the sow as follows: the work consists of a two-story building located outside the fence demarking a higher security area on the installation. The building will be approximately 34,500 square feet (sf) and house office space for 150 staff. The building construction shall utilize insulated metal and precast concrete wall panels on a steel frame and a flat membrane roof with 42“(minimum) parapet wall. Exterior heating, ventilation, and air conditioning (hvac) equipment will be installed at grade level on concrete pads. The interior will use standard commercial elements such as metal stud and gypsum board. The finishes and color scheme will be brown, and beige tans with accent color of blues, green, teal, and rust in conformance to srfo (savannah river field office) colors. Commercial hvac, electrical and communications systems, and fire protection will support utility infrastructure. Sufficient cooling systems for a server room will be provided. The project will utilize existing parking in the area but have a designed fire lane access road on two sides to access the fire department connection (fdc) on the building. This project includes all architectural, structural, mechanical, and electrical systems for a complete and usable facility.