Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 5,496 SY of asphalt pavement removal; 1,156 SY of concrete pavement removal; 28' of curb removal; 164 LF of guardrail removal; 622 LF of fencing removal; 3,344 CY of excavation; 12,565 SY of subgrade compaction; 3,465 CY of granular material, type b; 8,707 SY of geotextile fabric; 525 LF of guardrail, type mgs; 2,538 CY of topsoil furnished and placed 4" depth; 21,305 SY of seeding and mulching; 11,556 LF of 6" base pipe underdrains with geotextile fabric; 5,567 SY of pavement planing, asphalt concrete; 11,997 LF of full depth pavement sawing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
RFP for furnishing labor, materials, and equipment for the Trenton Franklin Road Widening project.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
RFP for furnishing labor, materials, and equipment for the Trenton Franklin Road Widening project.
AvailableWork includes rehabilitation of two existing bridges, replace two low lying bridges located at (1.67 mi and 2 mi respectively east of I-75 interchange and rehabilitate them by temporarily increasing their lane widths from 9'-0" to around 11'-0", demolition of the superstructures only and replacing with a proprietary sandwich plate system (sps) superstructure tied to new wide flange beams, marking, signage, creek debris removals, additional pavement widths, etc.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Work includes rehabilitation of two existing bridges, replace two low lying bridges located at (1.67 mi and 2 mi respectively east of I-75 interchange and rehabilitate them by temporarily increasing their lane widths from 9'-0" to around 11'-0", demolition of the superstructures only and replacing with a proprietary sandwich plate system (sps) superstructure tied to new wide flange beams, marking, signage, creek debris removals, additional pavement widths, etc.
The Town of Parker, Colorado (Engineering/Public Works) is soliciting qualifications from qualified firms to provide engineering professional services for the Dransfeldt Road Widening project, covering design and construction documentation for roughly 5,600 feet of roadway widening. The scope includes project management, land surveying, subsurface utility engineering, geotechnical and civil engineering, permitting, and construction administration; proposers must be licensed in Colorado and follow submission requirements (PDF proposal, 30-page limit, required attachments and references). Submissions are managed through the Town’s Bonfire procurement portal with questions due Feb 5, 2026, and final proposals due Feb 12, 2026 at 2:00 PM MST; the Town anticipates an award in April 2026 and construction scheduled in phases in 2027 and 2029.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Work consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Work consists of widening road, includes installation of traffic signals. Work includes improve sidewalk and drainage facility along the north side.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Parker, Colorado (Engineering/Public Works) is soliciting qualifications from qualified firms to provide engineering professional services for the Dransfeldt Road Widening project, covering design and construction documentation for roughly 5,600 feet of roadway widening. The scope includes project management, land surveying, subsurface utility engineering, geotechnical and civil engineering, permitting, and construction administration; proposers must be licensed in Colorado and follow submission requirements (PDF proposal, 30-page limit, required attachments and references). Submissions are managed through the Town’s Bonfire procurement portal with questions due Feb 5, 2026, and final proposals due Feb 12, 2026 at 2:00 PM MST; the Town anticipates an award in April 2026 and construction scheduled in phases in 2027 and 2029.
Available