Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation of two existing bridges, replace two low lying bridges located at (1.67 mi and 2 mi respectively east of I-75 interchange and rehabilitate them by temporarily increasing their lane widths from 9'-0" to around 11'-0", demolition of the superstructures only and replacing with a proprietary sandwich plate system (sps) superstructure tied to new wide flange beams, marking, signage, creek debris removals, additional pavement widths, etc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the widening of Back Orrville Road and the replacement of a bridge along that section.
Posted Date
Dec 26, 2025
Due Date
Jan 20, 2026
Release: Dec 26, 2025
Close: Jan 20, 2026
This RFP is for the widening of Back Orrville Road and the replacement of a bridge along that section.
AvailableRelease: Dec 26, 2025
Close: Jan 20, 2026
Work includes widening & bridge replacement.
AvailableAsymmetrical widening of the bridge over E-470 including expansion of the MSE wall on one side of the structure, signal upgrades at the ramp intersections, widening of roadway sections for tie-ins at the new bridge, multimodal improvements across the bridge, trail connectors and sidewalk improvements, along with drainage and water quality improvements for the bridge expansion.
Posted Date
Nov 26, 2025
Due Date
Jan 21, 2026
Release: Nov 26, 2025
Close: Jan 21, 2026
Asymmetrical widening of the bridge over E-470 including expansion of the MSE wall on one side of the structure, signal upgrades at the ramp intersections, widening of roadway sections for tie-ins at the new bridge, multimodal improvements across the bridge, trail connectors and sidewalk improvements, along with drainage and water quality improvements for the bridge expansion.
AvailableRelease: Dec 13, 2025
Close: Jan 22, 2026
Road and Bridge Paving Project
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis