Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Asymmetrical widening of the bridge over E-470 including expansion of the MSE wall on one side of the structure, signal upgrades at the ramp intersections, widening of roadway sections for tie-ins at the new bridge, multimodal improvements across the bridge, trail connectors and sidewalk improvements, along with drainage and water quality improvements for the bridge expansion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the widening and repaving of a portion of 1200 S, replacement of a bridge culvert, and associated utility work.
Posted Date
-
Due Date
Dec 17, 2025
Release: -
Close: Dec 17, 2025
This RFP is for the widening and repaving of a portion of 1200 S, replacement of a bridge culvert, and associated utility work.
AvailablePremium
Access the largest public sector contact database
The Project consists of widening and repaving, replacement of a bridge culvert, and some utility work.
Posted Date
Nov 24, 2025
Due Date
Dec 17, 2025
Release: Nov 24, 2025
Close: Dec 17, 2025
The Project consists of widening and repaving, replacement of a bridge culvert, and some utility work.
AvailableRoadway widening and HMA resurfacing of road. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Roadway widening and HMA resurfacing of road. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. See outside link.
AvailableConstruction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis