Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: Trenching/boring, conduit, PVC sweeps, and fiberglass sweeps includes 2,945 LF trenching/boring - dirt conditions, 2,945 LF trenching/boring - cobble conditions, 3,995 LF provide & install 2" conduit in above, 6 EA provide & install 2" PVC sweeps for above, 7 EA install PUD provided 2" fiberglass sweeps for above, 105 LF provide & install 3" conduit in above, 2 EA provide & install 3" PVC sweeps for above, 1 EA install PUD provided secondary pedestal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Boring under existing sidewalk to allow sewer line installation without full sidewalk removal.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
Boring under existing sidewalk to allow sewer line installation without full sidewalk removal.
Work includes approx. 1,284 LF of curb and gutter 24"; 292 LF of remove and relay - 12" storm sewer; 600 LF of install 10" CIPP sanitary sewer; 304 LF of pipe bursting private sanitary sewer lateral 4"; 100 LF of 6" sanitary lateral relay; 620 LF of 8" PVC water main w/gravel backfill; 160 LF of 6" DI water main w/gravel backfill.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
Work includes approx. 1,284 LF of curb and gutter 24"; 292 LF of remove and relay - 12" storm sewer; 600 LF of install 10" CIPP sanitary sewer; 304 LF of pipe bursting private sanitary sewer lateral 4"; 100 LF of 6" sanitary lateral relay; 620 LF of 8" PVC water main w/gravel backfill; 160 LF of 6" DI water main w/gravel backfill.
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close:
The work includes asphalt removal, storm sewer, catch basins, and manholes, pipe bursting sanitary sewer, sewer bypass, and sanitary sewer lateral replacement, asphalt pulverizing and tilling, cement treatment of base rock, curb, gutter and driveways, asphalt grinding and asphalt concrete pavement placement, traffic control, other miscellaneous items for completion of work.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
The work includes asphalt removal, storm sewer, catch basins, and manholes, pipe bursting sanitary sewer, sewer bypass, and sanitary sewer lateral replacement, asphalt pulverizing and tilling, cement treatment of base rock, curb, gutter and driveways, asphalt grinding and asphalt concrete pavement placement, traffic control, other miscellaneous items for completion of work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of the existing failing storm drain system as identified in the attached plans. The work to be performed under this contract includes, but is not limited to, the following items: Removal and replacement of the existing 48-inch HDPE storm drainage system, including associated storm structures, as identified in the construction plans. Installation of new storm drainage structures, Installation of 48-inch HP Storm Grey Polypropylene Solid Dual Wall Pipe storm pipe, complete with all required appurtenances, Traffic control and maintenance of traffic in accordance with approved traffic control plans, Dewatering operations as required to facilitate construction, Backfilling, compaction, grading, and restoration of disturbed areas, Borrow material placement and grading, as necessary, Storm drainage and structure installation, Erosion and sedimentation control measures, Grassing and final site stabilization and final grading providing surface drainage to new drop inlets.