Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Boring under existing sidewalk to allow sewer line installation without full sidewalk removal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of trenching and boring services for the NW Gilkison Rd project, including installation of conduit, sweeps, vaults, and associated restoration.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
Procurement of trenching and boring services for the NW Gilkison Rd project, including installation of conduit, sweeps, vaults, and associated restoration.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform trenching and boring along Northwest Gilkison Road, a Multnomah County road right-of-way. Directional (bore) approx. 8,200' to a minimum depth of 36" below final grade including trenching, backfill, and restoration.
Posted Date
Dec 31, 2025
Due Date
Jan 29, 2026
Release: Dec 31, 2025
Close: Jan 29, 2026
Perform trenching and boring along Northwest Gilkison Road, a Multnomah County road right-of-way. Directional (bore) approx. 8,200' to a minimum depth of 36" below final grade including trenching, backfill, and restoration.
AvailableInstallation of Portland Cement Concrete sidewalk, 6” & 12” water main via horizontal direction boring and open cut methods, water valve vaults, hydrants, roadway patching and other associated work. Driveway aprons will be replaced as needed.
Posted Date
Dec 29, 2025
Due Date
Jan 22, 2026
Release: Dec 29, 2025
Close: Jan 22, 2026
Installation of Portland Cement Concrete sidewalk, 6” & 12” water main via horizontal direction boring and open cut methods, water valve vaults, hydrants, roadway patching and other associated work. Driveway aprons will be replaced as needed.
AvailableSidewalk leveling project. Scope of Work consists of the leveling of approx 658 concrete sidewalk slabs, spread throughout the City. Most sidewalk within the City is 4' wide but there may be a few locations that are 5'.
Posted Date
Dec 29, 2025
Due Date
Jan 28, 2026
Release: Dec 29, 2025
Close: Jan 28, 2026
Sidewalk leveling project. Scope of Work consists of the leveling of approx 658 concrete sidewalk slabs, spread throughout the City. Most sidewalk within the City is 4' wide but there may be a few locations that are 5'.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →