Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes unclassified excavation, borrow excavation, concrete sidewalk (4"), crushed aggregate, sidewalk handrail, riprap, and erosion control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Approx 2687 CY excavation - common ; 1467 CY select granular embankment (CV) ; 5303 SY geotextile fabric type 5 (P) ; 3103 ton aggregate base class 5 ; 852 ton type sp 12.5 wearing course mixture (2,C) ; etc. See attached file.
Posted Date
Dec 20, 2025
Due Date
Jan 13, 2026
Release: Dec 20, 2025
Close: Jan 13, 2026
Approx 2687 CY excavation - common ; 1467 CY select granular embankment (CV) ; 5303 SY geotextile fabric type 5 (P) ; 3103 ton aggregate base class 5 ; 852 ton type sp 12.5 wearing course mixture (2,C) ; etc. See attached file.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: -
Close: Jan 7, 2026
Trail Improvements.
AvailableRelease: Nov 21, 2025
Close: Jan 9, 2026
Trail improvements.
AvailableWork includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Work includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →