Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 2687 CY excavation - common ; 1467 CY select granular embankment (CV) ; 5303 SY geotextile fabric type 5 (P) ; 3103 ton aggregate base class 5 ; 852 ton type sp 12.5 wearing course mixture (2,C) ; etc. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
AvailableIDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
AvailableIDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids for construction of a Portland Cement Concrete (PCC) multi-use trail from E. Grand Street to Lewis Lane in Carbondale, Illinois. The work includes ADA ramps, light pole relocation, and storm sewer improvements, and is scheduled for 70 working days. Bids are due at the IDOT January 16, 2026 letting at 12:00 PM Central via the Departments e-bidding system.
AvailableTrail Resurfacing Project.
Posted Date
Dec 17, 2025
Due Date
Feb 4, 2026
Release: Dec 17, 2025
Close: Feb 4, 2026
Trail Resurfacing Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →