CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Colby Circle Storm Drain Improvements Project
Provide Storm Drain Improvements Project.
Description: Burnham Borough is accepting sealed bids for construction of the proposed Traffic Circle Improvements project, with bids due at 12:00 p.m. local time on September 8, 2026 and public opening at 7:00 p.m. that evening. The solicitation offers two prime contracts: general construction, covering demolition, curbing, sidewalks, bollards, seeding, and mulching; and electrical work, covering lighting demolition, installation, and wiring. Bidding documents are issued by Keller Engineers, Inc.; the notice was originally advertised in a physical newspaper, and no online primary bid file or buyer-hosted detail page was located.
City · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Provide Storm Drain Improvements Project.
CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Provide Storm Drain Improvements Project.
Posted
Jul 31, 2026
Sep 28, 2026
Install and implement an adaptive traffic control solution (ATCS), including modifications to existing medians, upgrades to traffic signals, and installation of intelligent transportation system (ITS) improvements.
CityCA
Posted
Aug 24, 2026
Sep 30, 2026
Traffic signal improvements project (various locations).