Construction of the synthetic surface field, including Temporary erosion and sedimentation control facilities, SWPPP, Temporary chain link fencing as required to secure the construction area, Removal and offsite disposal of the existing organics including clearing and
stripping of existing organic material, Demolition and offsite disposal including irrigation piping, drainage piping asphalt paving, pavement, stockpiles, etc, Earthwork, excavation, filling, grading, disposal non useable materials, compaction of subgrade and finish grade establishment, Utilities including storm drainage with connections to public utilities, water quality, on-site conveyance, perforated subsurface drainage, and catch basins, Irrigation system installation including piping, valves, and connection to existing
on site system, Light poles and foundation installation, Electrical conduit and junction box installation athletic field lighting system, Cast in place concrete including concrete curbing and flatwork, Chain link fence including posts, footings, rails, fabric, and gates, Permeable aggregate materials for the synthetic field areas, Installation of elastic layer or supplemental pad for field areas, Installation of synthetic turf surface including lines and markings, Installation of new rubberized track surfacing and spray coats, Clean up and restoration of disturbed areas. Additive alternate #1 - supplemental pad, additive alternate #2 - video scoreboard.
Available