CityNY
Aug 13, 2026
Closes
Sep 8, 2026
Wastewater Treatment Plant 2026 Improvements Project RFP
Wastewater treatment plant 2026 improvements project
Description: Work includes wastewater lagoon shoreline armoring, outfall rehabilitation, and transfer valve replacement, and all other work required for the completion of the project.
City · IN, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityNY
Aug 13, 2026
Closes
Sep 8, 2026
Wastewater treatment plant 2026 improvements project
CityIN
Aug 6, 2026
Closes
Sep 8, 2026
Work include wastewater treatment plant improvements and expansion consisting of aeration system upgrades, a new aerated sludge holding tank, new (converted) equalization basin improvements, associated piping, electrical, controls, and related appurtenances.
Atwood Regional Water And Sewer District
Special DistrictOH
Aug 21, 2026
Closes
Sep 10, 2026
Division 1 base bid: encompass work within the wastewater treatment plant including replacement of process equipment (splitter box, blowers, air piping, diffusors, clarifier equipment and digester air system) a new generator, electrical upgrades, installation of gravity sewer piping, and construction of a new building to house the blowers and electrical components. Alternate 1: includes all labor, material, equipment, and appurtenances to provide and install mechanical screen location and appurtenances in the headworks building as shown on the plans and as stated in the specifications. Includes all concrete work associated with channel relocation, electrical improvements and mechanical screen location. Alternate 2: includes all associated labor, material, equipment, and appurtenances to provide and install all blowers, diffusers, and accessories for the project as shown on the plans and as stated in the specifications. Division 2 base bid: includes construction of the new administration building, new water supply well, grinder pump station and electrical installation. Alternate 1: includes removal and replacement of concrete floors and drive approach to an existing storage building.
CityGA
Jul 28, 2026
Closes
Sep 3, 2026
The construction of a 0.1 mgd wastewater treatment facility. Project includes the installation of a pre-engineered post-tensioned concrete tank and foundation, the installation of wastewater equipment including electrical work, the construction of a sludge wasting facility and related concrete work and the installation of (2) two pump stations and the installation of approximately 2,170 LF of a 4" HDPE effluent force main.
Procurement and program contacts connected to Town of Grandview.