CountyFL
Posted
Nov 3, 2026
Dec 8, 2026
Lane 2 Bus Wash Removal and Replacement RFP
The replacement and installation of one (1) drive-through lane style bus wash system. The current system is a Belinger two-lane drive through style bus wash. The new system will be located in Lane 2 of our Bus Wash building and will operate independently of Bus Wash Bay 1. This project will require the removal of arches, brushes, guide rails, a pump, compressor, tank, electronics and other non-functioning equipment prior to the installation of all new components necessary for a high-quality wash system. The new wash will need to be compatible with plumbing and electrical systems currently in place.
