Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Todhunter PRV project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of remove and reinstall pressure reducing valves 3 L.S. ; install pressure reducing valve stations 2 L.S.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Work consists of remove and reinstall pressure reducing valves 3 L.S. ; install pressure reducing valve stations 2 L.S.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes the replacement of three (3) pressure reducing valve vaults in The Woods water system, including mechanical work, grading, and pavement and site restoration.
Posted Date
Nov 5, 2025
Due Date
Feb 11, 2026
Release: Nov 5, 2025
Close: Feb 11, 2026
The work includes the replacement of three (3) pressure reducing valve vaults in The Woods water system, including mechanical work, grading, and pavement and site restoration.
AvailableWork includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
AvailableElectrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 28, 2026
Release: Dec 16, 2025
Close: Jan 28, 2026
Electrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →