Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes the replacement of three (3) pressure reducing valve vaults in The Woods water system, including mechanical work, grading, and pavement and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Great River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across a 22 acres area at (Bradshaw Woods, Le Center, Minnesota). Requested services for this project are for invasive woody species removal and replacement.
Posted Date
Jan 20, 2026
Due Date
Feb 18, 2026
Release: Jan 20, 2026
Close: Feb 18, 2026
Great River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across a 22 acres area at (Bradshaw Woods, Le Center, Minnesota). Requested services for this project are for invasive woody species removal and replacement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work includes construction of a new cast-in-place pressure reducing valve (PRV) vault and associated piping and appurtenances. The vault is to be a below grade cast-in-place concrete structure. The vault will include two PRVs, valves, flowmeters, pressure relief valves, and associated piping. The project includes the installation of DI pipe, PVC pipe, RCP pipe, storm drain manholes, and associated site restoration.
AvailableRemove the existing playground equipment and install new play equipment, and install an ada compliant sidewalk.
Posted Date
Jan 15, 2026
Due Date
Mar 12, 2026
Release: Jan 15, 2026
Close: Mar 12, 2026
Remove the existing playground equipment and install new play equipment, and install an ada compliant sidewalk.
AvailableWork consists of remove and reinstall pressure reducing valves 3 L.S. ; install pressure reducing valve stations 2 L.S.
Posted Date
Jan 21, 2026
Due Date
Feb 12, 2026
Release: Jan 21, 2026
Close: Feb 12, 2026
Work consists of remove and reinstall pressure reducing valves 3 L.S. ; install pressure reducing valve stations 2 L.S.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →