Work includes 1 LS of mobilization; 8,879 CY of granular borrow (plan quantity); 28,881 SY of separation geotextile; 22,687 CY of roadway excavation (plan quantity); 63 CY of small ditch construction (plan quantity); 195 ft of drainage pipe - 30", metal, silt-tight; 1 EA of circular steel safety end section 18", 4:1 slope, crossing; 6,211 CY of untreated base course (plan quantity); 72,677 SY of micro-surfacing; 20 CY of asphalt pavement soft spot repair - contingency item; 50 CY of utbc soft spot repair - contingency item; 10,008 TN of hmhma - 1/2"; 14 TN of emulsified asphalt (tack) ; etc, see attached file.