Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of deck tile demo & install - supply & install laticrete 9118 primer, demo machine rental , supply dumpster, supply & install horizontal depth markers & signage , supply & install daltile keystones mosaic trim s812, demo existing mosiac base, gutter tile demo and install - demo existing gutter tile & loose mud material @ gutter handhold demo waterline tile, supply & install daltile keystones mosaic tile @ gutter & waterline tile band, supply & install daltile keystones mosaic trim s812, supply & install laticrete 254 platinum as bond coat & thin set.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of South Portland is seeking a qualified firm to replace the pool deck flooring at the South Portland Community Center. This involves removing existing rubber coating and tile, and applying a full broadcast flake system in both areas.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
The City of South Portland is seeking a qualified firm to replace the pool deck flooring at the South Portland Community Center. This involves removing existing rubber coating and tile, and applying a full broadcast flake system in both areas.
AvailableThe Town of Telluride is seeking proposals for resurfacing the Lap Pool and replacing tile in both the Lap Pool and Rec Pool in the Town of Telluride's Town Park.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
The Town of Telluride is seeking proposals for resurfacing the Lap Pool and replacing tile in both the Lap Pool and Rec Pool in the Town of Telluride's Town Park.
AvailableThe Town of North Castle is soliciting bids for improvements to the North Castle Pool & Tennis Club’s pool and surrounding pool deck. The work includes construction and renovation activities for the pool and deck facilities as detailed in the bid documents. Bids are accepted through the Town’s BidNet Direct portal with a closing date of January 29, 2026 at 10:00 AM EST.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
The Town of North Castle is soliciting bids for improvements to the North Castle Pool & Tennis Club’s pool and surrounding pool deck. The work includes construction and renovation activities for the pool and deck facilities as detailed in the bid documents. Bids are accepted through the Town’s BidNet Direct portal with a closing date of January 29, 2026 at 10:00 AM EST.
Work consist of remove and replace the existing spa and filtration system, demo of existing spa equipment, install new spa shell (144"x92"x42. 5 deep), fiberglass shell, replumbed in schedule 40 ridge pvc, water line tile with depth markers on interior walls of spa, hook to pipes sleeved through the floor, install all new equipment package, including filter pump, jet booster pump, filter pump, and heater, all new piping, valves and fittings, reuse existing chemical controller, chlorinator, and ph feeder, new emergency shut off and timer system, build new deck around spa, all electrical work to be completed by contractor.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Work consist of remove and replace the existing spa and filtration system, demo of existing spa equipment, install new spa shell (144"x92"x42. 5 deep), fiberglass shell, replumbed in schedule 40 ridge pvc, water line tile with depth markers on interior walls of spa, hook to pipes sleeved through the floor, install all new equipment package, including filter pump, jet booster pump, filter pump, and heater, all new piping, valves and fittings, reuse existing chemical controller, chlorinator, and ph feeder, new emergency shut off and timer system, build new deck around spa, all electrical work to be completed by contractor.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis