Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of remove and replace the existing spa and filtration system, demo of existing spa equipment, install new spa shell (144"x92"x42. 5 deep), fiberglass shell, replumbed in schedule 40 ridge pvc, water line tile with depth markers on interior walls of spa, hook to pipes sleeved through the floor, install all new equipment package, including filter pump, jet booster pump, filter pump, and heater, all new piping, valves and fittings, reuse existing chemical controller, chlorinator, and ph feeder, new emergency shut off and timer system, build new deck around spa, all electrical work to be completed by contractor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of deck tile demo & install - supply & install laticrete 9118 primer, demo machine rental , supply dumpster, supply & install horizontal depth markers & signage , supply & install daltile keystones mosaic trim s812, demo existing mosiac base, gutter tile demo and install - demo existing gutter tile & loose mud material @ gutter handhold demo waterline tile, supply & install daltile keystones mosaic tile @ gutter & waterline tile band, supply & install daltile keystones mosaic trim s812, supply & install laticrete 254 platinum as bond coat & thin set.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Work consist of deck tile demo & install - supply & install laticrete 9118 primer, demo machine rental , supply dumpster, supply & install horizontal depth markers & signage , supply & install daltile keystones mosaic trim s812, demo existing mosiac base, gutter tile demo and install - demo existing gutter tile & loose mud material @ gutter handhold demo waterline tile, supply & install daltile keystones mosaic tile @ gutter & waterline tile band, supply & install daltile keystones mosaic trim s812, supply & install laticrete 254 platinum as bond coat & thin set.
AvailableRequest for proposals from qualified consultants to prepare a Master Plan for the City of El Centro Downtown and Civic Center.
Posted Date
Jan 1, 2026
Due Date
Jan 30, 2026
Release: Jan 1, 2026
Close: Jan 30, 2026
Request for proposals from qualified consultants to prepare a Master Plan for the City of El Centro Downtown and Civic Center.
AvailableProposals are requested from artists for exhibiting their two-dimensional or three-dimensional artwork in the Shelton Civic Center Rotating Art Gallery.
Posted Date
-
Due Date
Jan 31, 2026
Close: Jan 31, 2026
Proposals are requested from artists for exhibiting their two-dimensional or three-dimensional artwork in the Shelton Civic Center Rotating Art Gallery.
AvailableThe City of Santa Ana (Public Works) is soliciting bids for the Civic Center Rehabilitation Bristol to Shelton project to perform pavement reconstruction and resurfacing, concrete repairs, sidewalk/curb/gutter/ramp work, and traffic improvements including loop installation and striping. Electronic submittal is required by the deadline with original bid bond and notarized affidavits submitted as original hard copies for verification; the project will be awarded by lump-sum contract. The posting is a standard construction procurement (Bid), is open for bidding, and has an estimated start in April 2026 with a project duration of 40 working days.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
The City of Santa Ana (Public Works) is soliciting bids for the Civic Center Rehabilitation Bristol to Shelton project to perform pavement reconstruction and resurfacing, concrete repairs, sidewalk/curb/gutter/ramp work, and traffic improvements including loop installation and striping. Electronic submittal is required by the deadline with original bid bond and notarized affidavits submitted as original hard copies for verification; the project will be awarded by lump-sum contract. The posting is a standard construction procurement (Bid), is open for bidding, and has an estimated start in April 2026 with a project duration of 40 working days.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis