Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 649.900 CY borrow excavation; 6,450. 754 CY unclassified excavation; 391. 100 SY full depth asphalt pavement patching 3" unif.; 856 LF concrete curb and gutter (2'-0") ogee; 40 LF 24" RC pipe cul. -class iv; 3,310 TN rip-rap (class b); 29 EA drainage box rehabilitation; 272 LF 18" RC pipe cul. -class iv.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removals, milling, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, concrete sidewalk
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, milling, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, concrete sidewalk
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removals, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, culvert pipe, curb and gutter, concrete sidewalk, storm sewer, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, concrete pavement, asphalt pavement, structure replacement, culvert pipe, curb and gutter, concrete sidewalk, storm sewer, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
AvailableFurnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
AvailableWork includes miscellaneous painting, curb work, fencing & metal shed replacement.
Posted Date
Jan 8, 2026
Due Date
Feb 19, 2026
Release: Jan 8, 2026
Close: Feb 19, 2026
Work includes miscellaneous painting, curb work, fencing & metal shed replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →