Higher EducationCA
-
Closes
Aug 26, 2026
Roofing Replacement of Building 10 *RE-BID*
Work consists of removal of all existing decorative metal panel roofing and asphalt shingles on building 10; application of ft3 base sheet in all areas; installation of metal panels over the base sheet; installation of new metal flashings.