Kennedy Center Roof Replacement
Roof replacement project.
Description: Provide roof replacement.
SpecialDistrict · LA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Posted
Aug 26, 2026
Oct 1, 2026
Roof replacement project.
Special DistrictWI
Posted
Sep 9, 2026
Oct 9, 2026
Work inlcudes replacement of approximately 100,000 SF of roofing, removal of existing: stone ballast, edge metals, membrane, flashings, saddles, lightning protection, and bird deterrent.
Posted
-
Oct 20, 2026
This project entails the comprehensive modernization of the control and hydraulic power systems for the Stamford Hurricane Barrier. Under a single, integrated contract, the Contractor will replace the legacy, unsupported PLC system with a modern, secure industrial automation platform while executing two concurrent efforts. The first effort involves the systematic refurbishment of the HPU at each abutment. This work includes the containment and proper disposal of existing hydraulic fluids, followed by the replacement of wearable mechanical and electrical components, such as main and circulation motors, pumps, control valves, filters, and system sensors. Reusable structural components will be thoroughly cleaned, inspected, and certified prior to reinstallation.
Posted
Sep 17, 2026
Oct 2, 2026
The U.S. Army Corps of Engineers, New England District, issued a notice of intent for brand-name mechanical and hydraulic components for the Stamford Hurricane Barrier control-system replacement in Stamford, Connecticut. The project covers replacement and installation components for two hydraulic power units and associated manifolds, including valves, filters, breathers, transducers, gauges, and related hardware from specified manufacturers, with alternatives evaluated against stated compatibility and safety characteristics. This is market research rather than a formal competitive solicitation; capability statements are due by email within 15 days of posting, and no award or payment is guaranteed.