Summary
This project consists of restoration of the Tequesta Drive bridge. Perform mobilization/demobilization; Set up staging areas, including: fencing and vegetation protection barriers; Install environmental signage, erosion control devices and turbidity barriers; Perform water quality monitoring; Perform video documentation of the existing steel sheet piles before and after coating activities; Perform utility locates to ensure no utility conflicts; Maintain a set of as-built drawings to be delivered to the Village upon completion of the Project; Perform demolition activities and dispose of removed material; retaining walls and wing walls, pile caps, slope protection, outside face of spandrel panels, all faces of railing curbs and vehicular barriers, and outer surface of steel sheet piles; Remove existing sidewalk concrete header and re-cast at locations; Remove the existing damaged section of spandrel; Install new concrete spandrel section and bracing hardware and cast concrete closure pour; Remove veneer on spandrel section adjacent to the replaced spandrel section and replace with new veneer; Install veneer onto new spandrel section; Patch steel sheet pile perforations as necessary using chemical compound and/or FRP patch.