Florida Department of Transportation
State AgencyFL
Posted
Aug 6, 2025
Oct 9, 2026
Lake Worth Beach- Resurfacing SR-802/Lake Worth Rd Fr Everett Court To E of Erie St
Work includes approx. 2,515 LF of temporary barrier, F&I, low profile, concrete; mowing; clearing and grubbing; 20,827 SY of 1 1/2" milling existing asphalt pavement;14 EA of manhole adjustment; 8 LF of pipe handrail, guiderail, aluminum; 2,279 LF of concrete curb type D; 541 SY of 6" concrete sidewalk and driveways; 2 EA painted pavement markings; 10 EA of retroreflective sign.
