CountyMS
Posted
Oct 21, 2026
Nov 20, 2026
Construction/replacement of a Bridge RFP
Work inlcudes construction of bridge with addition of grading and drainage work.
Description: Work consists of new bridge/bridge replacement. Includes 59 SY of remove concrete sidewalk; 40 SY of remove concrete driveway; 33 remove concrete flatwork; 369 SY of remove asphalt pavement; 178 CY of roadway excavation; 29 ft of drainage pipe - 30", reinforced concrete, leak- resistant; 107 CY of untreated base course; 122 TON of hma - 1/2"; 560 SF of of concrete sidewalk; 192 ft of concrete curb and gutter type; 537 SF of concrete flatwork, 4" thick; 348 SF of concrete driveway flared, 7" thick; 230 SY of stabilization geotextile; 177 CY of granular backfill borrow; 127 SF of landscaping restoration; 132 SF of landscape restoration; 22 SY of spread salvaged topsoil; 22 SY of broadcast seed; sign type a-1, 12" x 24"; sign type a-1, 30" x 30".
StateAgency · UT, US
Adjacent opportunities open for bidding right now.
CountyMS
Posted
Oct 21, 2026
Nov 20, 2026
Work inlcudes construction of bridge with addition of grading and drainage work.
CountyIA
Posted
Oct 22, 2026
Nov 17, 2026
Replace the existing bridge on 280th Street over Middle Branch Wapsinonoc Creek with an 80-foot by 30-foot-6-inch continuous concrete slab bridge. Work includes removal of the existing bridge, roadway and channel excavation, structural concrete, epoxy-coated reinforcing steel, steel piling, guardrail, and entrance culverts. The contract also covers granular surfacing, revetment, traffic control, erosion-control measures, seeding, and mulching.
Iowa Department of Transportation
State AgencyIA
Posted
Oct 22, 2026
Nov 17, 2026
The solicitation calls for replacing a bridge over Branch Beaver Creek in Grundy County, Iowa. The described work includes reconstruction and rehabilitation. It also includes traffic-control services.
Virginia Department of Transportation
State AgencyVA
Posted
-
Nov 18, 2026
Work include 180 LF 15" storm sewer pipe; 41 LF 18" storm sewer pipe; 69 LF 24" storm sewer pipe; 17,293 CY excavation; 1,084 CY siltation control excavation; 334 LF temp. Silt fence type b; 12,168 LF rumble strip cylindrical asphalt; 14,579 LF saw-cut asphalt concrete (18 in. Depth); 153 CY conc. Cl. A4 bridge appr. Slab const. ; 4,931 CY structure excavation const; 217 LF bridge substructure rock socket drilled shaft (48" dia).
Decision makers connected to this RFP from Utah Department of Transportation.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
149 days before RFP
UDOT reported a Bridge Formula Program to rehabilitate or replace poor-condition and load-restricted bridges through screened and bundled projects.
>> All right. Well, again, yeah, I'm Cheryl Hersh. I'm chief structural engineer. Oh, that's the wrong one. And it's really my pleasure to be here today to kind of give you an update on the bridge formula program. It's been a really exciting program for us. Um it provided a lot of opportunities to help fund uh replacements of local bridges. So I kind of…
Commission Programming Workshop
Board meeting · May 14, 2026
Strategic plan
115 days before RFP
UDOT's Bridge Management Program records rehabilitation and replacement work that includes bridge replacement.
Rehabilitation & Replacement (R/R) Restore structural integrity or correct safety deficiencies Includes: Deck replacement, strengthening, bridge replacement.
Utah Department of Transportation Bridge Management Plan
Strategic plan · Jun 17, 2026
RFP published
Proposals due (10 days left)