Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 40 CF of rip rap around manhole cover; 137 LF of 24" dia. Polyvinyl chloride (pvc) sanitary sewer; 119 LF of steel casing pipe; 67 LF of abandonment of existing 21" rcp; 87 LF of abandonment of existing 15" rcp; 45 LF of restore existing curbs; 4,945 SY of seeding and sodding of disturbed area.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Hagerstown seeks bids to relocate Hole #5 at The Greens at Hamilton Run golf course, including S.E.S.C., underdrain and irrigation piping, grading, topsoil, seed, mulch, sod, and related work; an alternate includes sawcutting and concrete removal/resetting. A pre-bid meeting is scheduled for 2025-12-09 and proposals are due by 2026-01-06.
Posted Date
Nov 18, 2025
Due Date
Jan 6, 2026
Release: Nov 18, 2025
Close: Jan 6, 2026
The City of Hagerstown seeks bids to relocate Hole #5 at The Greens at Hamilton Run golf course, including S.E.S.C., underdrain and irrigation piping, grading, topsoil, seed, mulch, sod, and related work; an alternate includes sawcutting and concrete removal/resetting. A pre-bid meeting is scheduled for 2025-12-09 and proposals are due by 2026-01-06.
Premium
Access the largest public sector contact database
Construction of approx. 690 LF of 8" and 40 LF of 18" DIP gravity sewer main, four (4) manholes, 110 LF of 16" steel casing jack and bore installation, restoration of all disturbed areas to pre-construction conditions, and all other appurtenance.
Posted Date
Nov 5, 2025
Due Date
Jan 20, 2026
Release: Nov 5, 2025
Close: Jan 20, 2026
Construction of approx. 690 LF of 8" and 40 LF of 18" DIP gravity sewer main, four (4) manholes, 110 LF of 16" steel casing jack and bore installation, restoration of all disturbed areas to pre-construction conditions, and all other appurtenance.
Availablework to be done under this contract consists Wf the construction of approximately 237 lineal feet of 8-inch diameter pipe sewer, 43 lineal feet of steel casing pipe, 33 cubic yards of grade control channel, and appurtenances to be constructed.
Posted Date
Nov 8, 2025
Due Date
Dec 17, 2025
Release: Nov 8, 2025
Close: Dec 17, 2025
work to be done under this contract consists Wf the construction of approximately 237 lineal feet of 8-inch diameter pipe sewer, 43 lineal feet of steel casing pipe, 33 cubic yards of grade control channel, and appurtenances to be constructed.
AvailableWork consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work consists of the construction of 104 LF of new 18" diameter SDR 26 PVC sewer, two manholes, connection to existing lines, bypass pumping, dewater lift station wet well and flush force main, trench safety, decommission lift station including remove pumps and service panel and deliver to public Works yard, remove generator and switch gear and deliver to animal shelter, break up concrete to fill hole, cover with soil and re-vegetate and water of disturbed areas, and SWPPP. The work also includes furnishing and installing fall protection grates at the Weaver Street Lift Station and Gateway Boulevard Lift station.