Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hagerstown seeks bids to relocate Hole #5 at The Greens at Hamilton Run golf course, including S.E.S.C., underdrain and irrigation piping, grading, topsoil, seed, mulch, sod, and related work; an alternate includes sawcutting and concrete removal/resetting. A pre-bid meeting is scheduled for 2025-12-09 and proposals are due by 2026-01-06.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 40 CF of rip rap around manhole cover; 137 LF of 24" dia. Polyvinyl chloride (pvc) sanitary sewer; 119 LF of steel casing pipe; 67 LF of abandonment of existing 21" rcp; 87 LF of abandonment of existing 15" rcp; 45 LF of restore existing curbs; 4,945 SY of seeding and sodding of disturbed area.
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
Work includes 40 CF of rip rap around manhole cover; 137 LF of 24" dia. Polyvinyl chloride (pvc) sanitary sewer; 119 LF of steel casing pipe; 67 LF of abandonment of existing 21" rcp; 87 LF of abandonment of existing 15" rcp; 45 LF of restore existing curbs; 4,945 SY of seeding and sodding of disturbed area.
AvailablePremium
Access the largest public sector contact database
Provide Kit - Installation, Mount, Antenna, Pctel - 5/8 Hole Mount/Thick Kit.
Posted Date
Dec 10, 2025
Due Date
Dec 17, 2025
Release: Dec 10, 2025
Close: Dec 17, 2025
Provide Kit - Installation, Mount, Antenna, Pctel - 5/8 Hole Mount/Thick Kit.
AvailableWork includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
AvailableWork includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes relocation of approx 400 LF of 36" recycled water (rw) pipeline inside caltrans right-of-way to accommodate the interstate 5 freeway widening. The proposed alignment will place the 36" rw pipeline on the outside southbound lane of culver drive and will maintain 15' of separation from the proposed piles on both sides of the freeway overpass. The proposed work also includes the relocation of two combination air valves.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis