Summary
Work includes maintenance of traffic; erosion & water pollution control; removal of 4,745 SY of existing roadway including existing curb; 4,745 SY of excavation for granular base; 1430 SY of yard restoration (4" topsoil, seed and mulch);4,745 SY of 4" crushed stone base (less than 7% fines); 700 SY of geogrid reinforcement for subgrade repair (tensar bx 1200 or equivalent); 4,745 SY of 8" pcc pavement with integral 3" rolled curb; 6600 sf of 6" concrete apron/driveway replacement; 2,100 sf of 4" sidewalk removal & replacement; 3,400 LF of " rigid perforated pvc underdrain system - includes transverse underdrains; 1,930 LF of 6" solid pvc downspout collection line (in same trench as underdrain) and associated works.