Taylor Mill - Holds Branch Road Stabilization RFP
Aug 18, 2026
Closes
Sep 1, 2026
Work includes 48 SY of pavement repair with geogrid; 48 SY of pavement repair; 12 LF of pipe removal; 12 LF of 18" culvert pipe; 171 LF of removal and replacement of guardrail; 152 SY of yard restoration (4" topsoil, seed, and mulch); 2,340 LF of drilled shaft retaining wall - 30" reinforced piers 1 through 65; 608 LF of drilled shaft retaining wall - 24" unreinforced plugs p1 through p64.
