Wayne County Airport Authority
Special DistrictMI
Posted
-
Sep 17, 2026
Taxiway K South Reconstruction (TWY Y2 to R)
Works include approx. 3,000 LF of Installation and Removal of Catch Basin Inlet Protection (paved Areas); 5 EA taxiway ending sign; 6,700 SY pavement removal, asphalt shoulder variable depth; 1,400 SY cold milling 3' depth; 60 LF of 2" HDPE directional bore.