City Of Grand Prairie
Work include 5660 SF of retaining wall; 1374 LF of drilled shaft; 1 bridge structure; 3750 SY of concrete roadway pavement; 670 SY of sidewalk pavement; 4700 CY of excavation; 1048 LF of storm drain pipe; 1028 LF of water main; 630 LF of wastewater pipe; miscellaneous additional items.
Release
Oct 08, 2024
Close
Oct 22, 2024