Kentucky Transportation Cabinet
State AgencyKY
-
Closes
Aug 20, 2026
Dixon To Sebree Road (KY 132) RFP
Asphalt resurfacing work on 4.94 miles of KY 132 featuring 335.00 TON of DGA Base, 758.00 TON of Leveling & Wedging, 500.00 TON of asphalt mix for pavement wedge (1" max thickness), 3,685.00 TON of CL2 asphalt surface mixture, edge key construction (1.0" thickness), asphalt milling/texturing (45.00 TON total), base failure repair (425.00 SQYD total), removal of approach pavement on bridge B00114N, 52,166.00 LF of edgeline rumble strips, 27,000.00 LF of temp 6" paint striping, and 104,332.00 LF of perm 6" paint striping