Kentucky Transportation Cabinet
State AgencyKY
Aug 13, 2026
Closes
Aug 20, 2026
263023 - KY 1163 (KY 1163) (MP 0.000) From KY 181; KY 2584 (KY 2584) (MP 0.000) From KY 181 - Asphalt Resurfacing RFP
Asphalt resurfacing. Work includes 130 Ton DGA base; 104 Ton leveling and wedging; 15 Ton asphalt pavement milling and texturing; 115 SY of base failure repair; pavement markings; 18,500 LF of edgeline rumble strips; signage. See attached files.