Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS clearing and grubbing c; 150 CY topsoil, off-site; 310 ton class i, bedding material, 1" commercial clean stone; 466 ton replacement of unsuitable backfill material, gr 32, (modified subbase pile); 24 LF storm sewer gravity main, trenched, 36" RCP; 24 LF removal of storm sewer; 1 EA pipe apron, 36" rcp; 1 EA footing for concrete pipe apron, 36" RCP; 1 EA pipe apron guard, 36" RCP; 19. 38 VF manhole type, 48" sw-301; 11. 03 VF manhole type, 60" sw-301; 1 EA connection to existing manhole; 7 SY removal of sidewalk; 7 SY pcc, sidewalk, 4" (thickness); 16,439 SF hydraulic - seeding, fertilizing, and mulching, type 1, by sf. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Nov 20, 2025
Close: Jan 6, 2026
Work includes sanitary court sewer extension.
AvailableRelease: Nov 20, 2025
Close: Jan 6, 2026
Work includes sanitary court sewer extension.
AvailableStorm sewer and roadway improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Storm sewer and roadway improvements.
AvailableThe Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
The Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis