Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project focuses on the replacement of the existing boiler and chiller system with a water to air heat pump system. In the completion of this work, the replacement of piping, pumps, and floor transfer boxes will also require evaluation and replacement. In addition, this project will also replace the domestic hot water heating system of the building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Headquarters office building HVAC system upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Headquarters office building HVAC system upgrades.
AvailableState DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Posted Date
Dec 1, 2025
Due Date
Jan 16, 2026
Release: Dec 1, 2025
Close: Jan 16, 2026
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
AvailableMiddle school hvac upgrades.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Middle school hvac upgrades.
AvailableAuditorium HVAC Upgrades at High School.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Auditorium HVAC Upgrades at High School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis